Use the statement for the installation address
Enter the island and locality, electricity provider, tariff description, energy rate per kWh, currency and bill date. Add pump power and operating hours, marking any items you still need to check. For a managed residence, ask the person responsible for the account to supply the details. Regional assumptions cannot stand in for that record.
Review coastal exposure as a question
Describe the property’s relationship to the sea, the shade near the pool and the wind or rain conditions you observe. Show the space that would remain for maintenance access. Mounting and material suitability for that location should be discussed with the installer; this page makes no assurance about a particular exposure or weather event.
Document the equipment already there
Photograph the pump label, filter and controls, then explain any spa or water-feature routine. Dedicated panels feed the pump without a tie-in to the home electrical panel or rooftop system. Ask which local supply characteristics and connection details are needed to review the AC side. Existing plumbing also belongs in the configuration discussion.
Put import and final delivery in writing
Ask where the shipment would be received, who handles customs, which charges are included and how it reaches the property. If a further island transfer is involved, identify the arrangement before ordering. Include postcode, receiving contact and access conditions. Freight availability, clearance and delivery timing all require confirmation in the quote.